It is proposed the Latrobe City Sports and Entertainment Stadium will become the centre of excellence for football (soccer) in Gippsland – providing a pathway for promising young athletes to elite sport through Gippsland FC and other high-performance programs.

Works included upgrades of current grass pitches and construction of a synthetic pitch with lighting.

The full-size FIFA accredited synthetic pitch has been installed by Turf One and is already being enjoyed by local and regional clubs.

An official opening was held on 10 July, 2019 with representatives from Football Federation Victoria, Latrobe Valley Soccer League, Gippsland FC and a range of local stakeholders joining with Latrobe City Council and Latrobe Valley Authority to kick off a new era for the site.

The new pitch provides for 11-a-side, nine-a-side and seven-a-side soccer as well as multi-purpose usage.

Highlights of this project included construction of:

  • A new synthetic pitch of 105 x 68 metres plus run off, perimeter pathways and storages areas officials and players benches,
  • Six-metre-high ball catching net along Crinigan Road
  • 100 Lux LED lighting
  • Removable goals for full size and small sided soccer
  • About 230 metres of perimeter fencing along Crinigan Road and within the reserve.
  • Power upgrade for new and future lighting.
  • Click here to view a time lapse video of the construction process.

The synthetic field was the first phase of a longer-term overhaul of the iconic Latrobe Valley facility in line with Latrobe City Council’s master plan for the site.

Upgrades to grandstands, change rooms and club rooms are also being considered in line with future potential funding opportunities.

Council has worked with FFV and governing bodies to determine the requirements for Centre of Excellence status and to refine the parameters for development pathways.

In 2017 Council purchased the facility back from its private owners to ensure it was developed and used as a community asset and immediate works were completed to bring the change rooms up to quality and safety standard for major events.

Melbourne Victory has since utilised the facility for A-League pre-season and W-League in-season games.

A consultant was engaged early on to develop a master plan and business model, following extensive consultation with the full range of facility stakeholders including Falcons 2000, Gippsland Football Club, Football Federation Victoria (FFV), Latrobe Valley Soccer League, Referees Association and current tenant – Tribes.

A Project Reference Group consisting of a range of local stakeholders helped guide the project.

If you would like to be updated with our regular Major Recreation Newsletter subscribe.

Project timeline

Completion date: end-2019

Funding: $1.7 million