Works currently being carried out (weather permitting) include:

Civil Projects

  • Footpath Grinding Program 
    Grinding of footpath defects throughout the municipality 
  • Footpath Bay Replacement Program 
    Replacement of identified footpath defects throughout the municipality
  • George Bates Reserve, Yallourn North – LED lighting upgrades 
    LED lighting upgrade to AFL oval
  • Safe Travel in Local Streets Program 
    Raised safety platforms, pedestrian refuges, and kerb outstands in Buckley St, Church St, and Hoyle St, Morwell
  • Safe Travel in Local Streets Program 
    Raised safety platforms, pedestrian refuges, and kerb outstands, in Albert Street, George Street, Kirk Street, Moore Street and Skeltons Lane, Moe
  • Safe Travel in Local Streets Program 
    Wombat crossings, raised safety platforms, and traffic islands Breed St, Kay St, Franklin St and Church St, Traralgon
  • Reconstruction of Downies Lane Bridge, Downies Lane Traralgon South 
    Replacement of bridge and installation of retaining walls 
  • Installation of new fencing – Main St Carpark, Glengarry 
    Installation of post and rail fencing
  • Asphalt Overlay Program – Main St, Yinnar 
    Profiling of existing surface and placement of asphalt wearing course
  • Footpath Bay Replacement, Griffiths Court, Traralgon 
    Reconstruction of footpath at Griffiths Court
  • Keith Morgan Drive, Traralgon South 
    Construction of kerb and footpath at primary school bus bay
  • Coalville Road, Moe 
    Construction of kerb, footpath and vehicle crossovers on the eastern side between Cemetery Road and Wirrana Drive intersections.
  • Morrows Road, Boolarra 
    Construction of concrete headwall on existing road crossing culvert

Major Projects

  • Flynn Hall and Tennis Courts, Flynn
    Construction of New hall and Tennis Courts, demolition of old hall
  • LCSES Synthetic Pitch Light Pole Relocation 
    Relocating the light poles on the synthetic pitch at LCSES
  • Glengarry Mechanical Hall Upgrade 
    Renovations to amenities, kitchen refurbishment, new DDA amenities and restorations including surround sound system and acoustic panels installation 
  • Toongabbie Hall 
    New reverse cycle air-conditioning, insulation and sump pump to remove excess water under the hall 
  • Morwell Rec Reserve Grandstand upgrade 
    Renovations to the existing changerooms, extension to the back of the grandstand to include new amenities 
  • Moe Rail Precinct Revitalisation Project Stage 2 
    Construction of a youth precinct with a skate park, public open space, barbecue area with green lawns, car park etc.