Vehicle Crossing Permit Application Form

Is there a NBN pit?
Is this an additional vehicle crossing?
Is there a redundant vehicle crossing?
Do you require a coloured vehicle crossing?
Is there a fire plug/stop valve?
Is the concreter the applicant? (if yes, no need to provide details below)

Any damage to public infrastructure assets or pollution from the concrete works which is not repaired or cleaned up at the completion of works with be resolved at the owner's expense.
Concrete works must not commence prior to the issue of this permit, as specified in Local Law 3. Failure to comply with Local Law 3 may incur a penalty.
The permit fee is GST free.